General presentation
Easycube designed and built one shop for Total Wash located at the Roissy airport.
Technical presentation
The module is made up of 4 areas, a shop, a PMR WC, a technical room and a safe room with door and burglar-proof panel.
Key figures
- Surface: 32 sqm
- Conception and manufacturing: 5 weeks
- On-site installation: 2 weeks