General presentation
In collaboration with our mother company Dreyer, Easycube designed and built the first bio-waste room for TotalEnergies for its relay located in the Porte d’Alsace Nord area. Future TotalEnergies relays will also be equipped with an organic waste room.
Technical presentation
To carry out this project, Easycube relied on the know-how of the mother company Dreyer with isothermal panels in EPS (Expanded Polystyrene). A positive sliding door with a sliding strip curtain and a monobloc reefer unit, allowing the room to maintain a temperature of + 4 ° C, were installed by our teams.
Key figures
- Surface: 7 sqm
- Conception and manufacturing: 4 weeks
- On-site installation: 5 days