General presentation
In just a few months, Easycube transformed and rehabilitated a feed point into a complete building of almost 1,500 m² to house the collective restaurant for the military groups present on site. This new complex consists of a refectory, an industrial kitchen, positive and negative cold rooms, storage rooms and staff areas.
Technical presentation
Easycube implemented a unique construction system to design and manufacture an off-site modular building adapted to the layout of the collective restaurant. The rehabilitation of the existing building required the patching and resumption of civil engineering, the construction of walls, the replacement of tiles and false ceilings, and the modification and creation of partitions. Our assembly teams also brought the electrical installation and HVAC systems up to standard.
Key figures
- Surface: 1 410 sqm
- Conception and manufacturing: 12 weeks
- On-site installation: 6 months